The USN 42 is out being looked at and tested to make sure everything is ok and if any changes have to be made.It will be awhile before everything is done because of the size of it ( 76 missions I think ).

My son has started work on the second part of The Big E,it starts after her repairs and refit after all the battle damage she had received in the first year of the War.Her flight deck was lengthen and widened,more AA guns and fire control radar were added.Her first combat sortie after was in November 1943.

This campaign will start in November 1943 and go to the end of 1944.Some of the missions have probably not been done before in CFS2,while others have been covered.

He said he has 5 missions done so far,so it is just beginning.

Hiede